Current Construction Activity:GVEA solar graphic

  • Sept to Oct: Testing and commissioning
  • September: Electrical work
  • July 23 to August 31: installation of the racks and solar panels
  • July 9 to 20: Foundation work
  • June 18 to 29: Survey work

GVEA signed a contract with ABS Alaskan, Inc. to install the solar array panels for GVEA's Solar Project. The location is on GVEA property near Van Horn Road, south of the GVEA's Battery Energy Storage System (BESS) and Wilson Substation facilities, which is visible from Van Horn Rd.

Here are the details:

  • Size: 563 kW Solar PV System
  • Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kWh/month).
  • Footprint is 3 acres
  • Panel manufacturer:  CSUN
  • Each of the 1,760 panels will generate 320 watts.
  • Contractor: ABS Alaskan, Inc.
  • Estimated to be online: October 2018
  • Cost: $850,000 after a $225,000 grant supplied from United States Dept. of Agriculture (USDA) Rural Energy for America Program (REAP) 

Resources - Solar Project

Project Overview Video

Ruralite Article (Feb 2018, pg 4)

 

 

 

 

 

 

 

 

 

 

Payment Options

Now More Ways to Pay Your Bill:

  • Online ... GV E-Bill
  • Mobile App - NEW
  • Automated Phone System
  • More...

Power Outages

    Outage Information

    - Outage Map

    - Account Maintenance Form

    - Generator Booklet

    - Resources 

 

 

 

 

 

GVEA Digital Media

Blog logo Facebook icon youtube logo-square small ruralite

- - - - - - - - - - - - - - - - - - - - - - - - - - - -

PowerToUseLess